Latest story
Keboola: a two-sentence prompt to Claude Code merges 13 Zend-removal PRs in about 22 hours through an existing agent harness
Vojta Biberle describes pointing Keboola's existing agent harness at removing the remaining Zend Framework 1 code from Keboola Connection, which is otherwise on Symfony. The whole brief was two sentences: remove as much Zend as possible by Friday, work in worktrees, use the repo's skills and don't open too many PRs at once. A main Claude Code session acted as organiser, starting subagents that each took a task from Linear through draft PR, end-to-end tests, an ai-review label and the merge queue, guided by a dependency map checked by a script. Some changes merge on bot approval; others wait for human review. In about 22 hours 13 PRs were merged and three more were open, with a median open-to-merge time of about two hours.
13 in about 22 hours (3 more open)
Merged PRs
About 2 hours (fastest 57 minutes)
Median open to merge
56 dependencies of the new codebase on the old one
Dependencies removed
Caveats
Written by the engineer who ran the experiment, on his personal blog; he does not state his role at Keboola. The merged changes were small. The harness was built beforehand and the post does not say how long that took. The 56-dependency figure appears in the post without saying whether it was all from this run. Overnight PRs waited 10–13 hours for review, and the E2E queue and human approvals were the main slowdowns. One task duplicated already-merged work after the agent read a stale local main.